
11.01.2018
NEW MAIPO BRIDGE WORKS COMPLETED
The New Maipo Bridge, in the Chilean Route V and part of Autopista Central, was inaugurated by Chilean President Michelle Bachelet last Thursday, December 14th. The new Maipo bridge is 475 m long. It is formed by two bridges, with typical span lengths of 71 m. Each deck is 18.30 m wide and...
12.03.2025
Inauguración en Ruanda del Cyangoga Trail Bridge
Nos complace compartir que el pasado 21 de febrero se inauguró el CYANGOGA TRAIL BRIDGE, un proyecto en el que FHECOR ha tenido el honor de participar, colaborando un año más con la ONG Bridges to Prosperity (B2P) y, en esta ocasión, también junto a la Fundación Pryconsa. Ubicado en el distrito de...

12.03.2025
Inauguración en Ruanda del Cyangoga Trail Bridge
Nos complace compartir que el pasado 21 de febrero se inauguró el CYANGOGA TRAIL BRIDGE, un proyecto en el que FHECOR ha tenido el honor de participar, colaborando un año más con la ONG Bridges to Prosperity (B2P) y, en esta ocasión, también junto a la Fundación Pryconsa. Ubicado en el distrito de...
11.03.2025
New project for the Junta de Andalucía
On February 24th, we signed a contract with the Ministry of Public Works of the Junta de Andalucía for the drafting of the construction project: Humanization of the thoroughfare and connection of Montequinto on the A-376 Road, with a completion period of 24 months. The work will involve drafting...

06.03.2025
Inspiring future generations at Fhecor
For the second year in a row, Fhecor has opened its doors to young students, giving them their first glimpse into the professional world. Last year, we welcomed students from the Lycée Français de Madrid (3rd year of ESO), and this year, we had the pleasure of hosting four students from Colegio...

21.02.2025
Main ring of the Padre Anchieta Footbridge
During the night of last Tuesday, February 18th, the main ring of the Padre Anchieta Footbridge, located in San Cristóbal de La Laguna, Tenerife, was closed. Despite the complex geometry of the pedestrian ring, the fit of the last piece with what was already built was almost perfect. When its...
18.02.2025
Start of the launching of the Bridge Over La Malata Inlet
On January 31, the first phase of the launching operation—out of a total of four—of the bridge over La Malata Inlet was successfully completed. This is a steel truss bridge consisting of seven spans and measuring 396 meters in length, designed by Fhecor as part of the construction works for the...
18.12.2024
Fhecor wishes you Happy Holidays and a Prosperous New Year 2025
Another year has passed, and we want to celebrate with you the progress and milestones achieved in 2024.
This time, we would like to share a unique experience: a virtual exhibition of high-level photographs. This initiative stems from our desire to highlight the beauty and effort behind each...