Main ring of the Padre Anchieta Footbridge

02/2025

During the night of last Tuesday, February 18th, the main ring of the Padre Anchieta Footbridge, located in San Cristóbal de La Laguna, Tenerife, was closed. Despite the complex geometry of the pedestrian ring, the fit of the last piece with what was already built was almost perfect. When its construction is completed, scheduled for September 2025, the footbridge way will solve the connection of the multiple accesses necessary to the different spaces and buildings of the University of La Laguna existing in the surroundings.
The Padre Anchieta Footbridge, designed by FHECOR, was the winner in the competition promoted by the Tenerife Cabildo in 2018, and is being built by OHLA as main contractor and MEGUSA as steel workshop, with FHECOR and TRAZAS Ingeniería as supervisor on site.