On January 31, the first phase of the launching operation—out of a total of four—of the bridge over La Malata Inlet was successfully completed.
This is a steel truss bridge consisting of seven spans and measuring 396 meters in length, designed by Fhecor as part of the construction works for the railway access to the outer port of Ferrol (A Coruña, Spain).
Fhecor is responsible for the launching engineering design as well as the supervision of all operations.