New Contract for the Comprehensive Renovation of the Granada-Almería Line

11/2024

On November 13, we signed a new contract with the Railway Infrastructure Administrator (ADIF) as part of a joint venture with INGEROP T3, S.L.U., and Centro de Estudios de Materiales y Control de Obra, S.A. (CEMOSA). The contract involves drafting construction projects for the renovation of the Granada-Almería section. Lot 1 focuses on the Granada-Iznalloz segment, with an execution period of 24 months.
The work will involve drafting the construction project to define the details of the works to be carried out and the execution process. This level of development will enable the contracting and implementation of works between Granada (PK 56/417) and Iznalloz (PK 23/696) on the Granada-Moreda Line 416.
The renovation will include improvements to all infrastructure elements, enhancing performance and increasing the competitiveness of this connection. This will allow for higher freight train capacity, accommodating trains up to 750 meters in length.
Regarding existing structures in this section, there are eight concrete bridges, three masonry bridges, and three metal bridges. Additionally, adjustments will be made to both the vertical and horizontal clearances of 17 overpasses.
This new contract adds to FHECOR's extensive experience in the field of railway infrastructure.